Heat pumps, boilers, ventilation · Free quotes, compare several tradespeople.
100, route de Volmerange, 3593 Dudelange
Association
Rue de Schwiedelbrouch, 8806 Rambrouch
Sàrl
57, Rue de la Gare, 6440 Echternach
Sàrl
22, rue de l'Industrie, 8399 Windhof
Sàrl
5, Avenue de la Gare, 9540 Wiltz
Sàrl
54, Zone Op Zaemer, 4959 Bascharage
Sàrl
12, Rue des Trois Cantons, 8352 Dahlem
Sàrl
3 - 5, rue d'Arlon, 8399 Windhof
SA
28, Boulevard Prince Henri, 4280 Esch-Sur-Alzette
Sàrl
72, Rue du Canal, 4051 Esch-Sur-Alzette
Société à responsabilité limitée simplifiée
9, Op de Géieren, 4970 Sprinkange
SA
37, Rue de la Gare, 9707 Clervaux
Sàrl
4, Zone d'Activités Économiques Kehlen, 8287
SA
19, rue de la Gare, 3237 Bettembourg
Sàrl
1D, route du Vin, 5445 Schengen
SA
1D, route du Vin, 5445 Schengen
SA
26, Route de Capellen, 8279 Holzem
Sàrl
1, Rue de l'Etang, 5326 Contern
SA
11, Rue Jean Origer, 3540 Dudelange
Sàrl
23, Grand-Rue, 6630 Wasserbillig
Sàrl
In Luxembourg, heating and air-conditioning installers work on single-family homes as well as apartment buildings, in new construction and in renovation alike. A heating engineer listed in the Vert.lu directory must hold an autorisation d'établissement issued by the Ministry of the Economy and be registered with the Chambre des Métiers or the Chambre de Commerce, a legal requirement for running a trade business in the country.
Replacing a fossil-fuel boiler with a geothermal heat pump can be subsidised up to 12,000 € through the Klimabonus, depending on the technology and the building. Applications go through MyGuichet.lu, and the company carrying out a heating installation must supply the technical documents required for the file; ask it to confirm eligibility before you sign anything.
Before appointing anyone for a heating installation, check the company's autorisation d'établissement, ask for a detailed quote that separates materials, labour and ancillary costs, and compare at least two or three proposals: in Luxembourg, price, lead times and warranties for the same job often vary considerably.
Vert.lu compiles companies from public sources (trade register, Chambre des Métiers) as well as information companies submit themselves; requesting a quote through Vert.lu remains free and without obligation, the contract and the execution of the work being the sole responsibility of the company you choose.
Depending on the project, work can be co-funded through the Klimabonus scheme. Applications go through MyGuichet.lu, and the company doing the work must supply the supporting documents.
Vert.lu does not carry out the work: the contract and its execution are the responsibility of the company you choose.
A heating engineer (chauffagiste) installs, replaces and services a home’s heat generation and distribution systems: gas, oil or biomass boilers, air-to-water or ground-source heat pumps, underfloor heating, radiators and hot water cylinders. This also includes periodic servicing, sweeping of flue ducts, and commissioning or checking ventilation systems linked to heating, such as mechanical ventilation with heat recovery.
This trade does not cover the home’s general electrical installation, insulation of the building envelope (roof, walls, windows) or sanitary plumbing unrelated to heating. These fall under other trades, even though they are often coordinated within the same energy renovation project.
Mechanical ventilation is part of the scope when it is tied to the building’s energy performance, particularly in new builds or major renovations subject to an energy passport requirement.
Heating professionals work on both new builds and renovations. In an existing home, replacing a heating system often goes hand in hand with a broader look at insulation and ventilation, since an efficient heat generator cannot compensate for a poorly insulated building envelope. This is why many heating projects become part of a wider energy renovation, even when the initial request only concerns the boiler or the heat pump.
Ongoing follow-up is also part of the trade: an annual service contract allows the installation’s efficiency to be monitored, breakdowns to be prevented, and the equipment’s lifespan to be extended. This follow-up matters especially for heat pumps, whose performance depends on correct settings and regular cleaning of the outdoor units.
Certain signs should prompt action: unusual boiler noises, recurring pressure loss, radiators cold at the top or bottom, a gas smell, soot deposits, or heating bills rising sharply without any change in use. These symptoms warrant a diagnosis by a heating professional before a complete breakdown occurs, often during cold spells.
In Luxembourg, periodic servicing of heating installations is a legal obligation, as is regular sweeping of flue ducts, which relates to fire safety and home insurance. These operations must be carried out by an authorised professional, who issues a certificate that should be kept on file.
Any work on a gas installation must be entrusted to an authorised professional, given the risks of carbon monoxide poisoning and explosion. A connection, modification or boiler replacement carried out without the required checks puts the occupant at risk and creates liability.
Finally, a valid energy passport is mandatory when selling or renting out a property. Replacing the heating system is often a good opportunity to improve the property’s energy rating and therefore its value or rental appeal.
The initial request describes the property, the existing installation and the need: a repair, replacement of an ageing unit, or a full energy renovation project. An on-site visit allows the professional to assess the required output, the condition of the ducts, access to the plant room, and compatibility with underfloor heating or existing radiators.
The heating professional draws up a detailed quote covering equipment, labour, timelines and warranty terms. For a boiler replacement or heat pump installation, work generally takes one to a few days, excluding equipment lead times, which can run to several weeks depending on the model chosen.
An underfloor heating project as part of a renovation takes longer, since it often involves floor works and coordination with other trades. The client prepares access to the relevant rooms, clears the area around the existing boiler, and gathers useful documents: previous servicing invoices, floor plans if available, and any existing energy passport.
At the end of the works, the installation is commissioned, adjusted and its operation explained to the client. A compliance check, particularly for gas, along with the handover of warranty and servicing documents, closes the project. These documents should be kept for future servicing and for any future sale of the property.
The cost of a heating project depends on the equipment chosen: a condensing gas boiler, an air-to-water heat pump and a ground-source heat pump differ in both purchase price and installation cost. The output required, linked to the property’s size and insulation level, is a key factor.
The complexity of the installation also matters: like-for-like replacement, a change of energy source, creating underfloor heating, adapting existing radiators to a heat pump, the length of distribution pipework, and access to the plant room. The need for boreholes for ground-source heat, or a reinforced electrical connection for a heat pump, adds further cost.
The annual service contract, the sweeping frequency required for the fuel type, and any related works, such as bringing a chimney flue up to standard, complete the budget. Any price range given by a professional remains an indicative range, to be confirmed after a site visit.
The condensing gas boiler remains widespread in Luxembourg, valued for its moderate installation cost and compact size. Its efficiency depends heavily on correct settings and the return temperature of the distribution network. It stays tied to the price of gas and its carbon footprint, though, which leads many owners to consider an alternative when replacing it.
The air-to-water heat pump draws heat from outdoor air to warm the water in the heating circuit. Its coefficient of performance varies with outdoor temperature and the flow temperature required by the heat emitters. It works well with underfloor heating or low-temperature radiators, less well with older radiators sized for a fossil-fuel boiler, unless these are partly replaced.
The ground-source heat pump captures heat from the ground via horizontal loops or a vertical borehole. It offers more stable performance across the year, less sensitive to outdoor temperature swings, but involves a higher upfront investment and groundworks or drilling that are not always feasible depending on the plot.
The biomass boiler, fed with pellets or logs, remains an option for homes with enough storage space for fuel. It requires more frequent maintenance than other systems, particularly for ash removal and cleaning the firebox, but draws on a renewable and often local resource.
The choice between these technologies depends on the existing property, its insulation level, available electrical capacity and budget. An experienced heating professional should be able to explain why one solution suits a given situation better than another, rather than systematically proposing the same equipment to every client.
A well-maintained gas boiler generally lasts fifteen to twenty years, a heat pump fifteen to twenty-five years, depending on installation quality and servicing frequency. An annual service contract allows efficiency to be tracked over time, sensitive components such as the heat exchanger or outdoor unit to be cleaned, and wear to be detected before it causes a breakdown.
For a heat pump, servicing typically covers cleaning the outdoor unit, checking the refrigerant where regulations require it, and verifying control settings. For a gas boiler, it covers checking combustion, cleaning the heat exchanger and verifying the tightness of connections.
A service contract is often a condition for maintaining the manufacturer's warranty over the long term. It is worth comparing several contract offers, checking exactly what they cover: a simple inspection visit, or an intervention that includes replacement parts for minor faults.
Replacing a hot water cylinder, often carried out alongside the heating installation, follows a different timeline: its lifespan is generally ten to fifteen years, with leak risk rising noticeably beyond that point. Planning its replacement at the same time as the boiler or heat pump can help limit intervention costs.
Several schemes can reduce the cost of a heating project in Luxembourg. The Klimabonus Wunnen, which replaced the former PRIMe House programme in 2022, supports, among other things, replacing a fossil-fuel boiler with a heat pump or another renewable system, as part of a broader energy renovation, and covers various categories of work related to the property’s energy performance.
Some municipalities offer additional aid, which may be combined under conditions set by each commune. The reduced 3% VAT rate for housing can apply to certain renovation works in a main residence, subject to conditions that should be checked case by case.
Amounts, caps and eligibility conditions change regularly. For up-to-date criteria and procedures, consult guichet.lu, myenergy.lu or klima-agence.lu, or seek energy advice before signing a quote.
Check that the company holds a business licence (autorisation d’établissement) from the Chamber of Trades for the heating profession, along with professional liability insurance covering work on gas and heating installations.
Ask for a written quote detailing the equipment, brand, output, labour and timelines. A serious quote also states the applicable warranties: the manufacturer’s warranty on equipment and the installer’s warranty on the work. Ask for references from comparable projects, ideally in your region.
The company’s responsiveness is an important criterion, especially for breakdowns during cold weather. A reliable professional gives a realistic intervention timeframe and keeps appointments for site visits and annual servicing.
Choosing equipment based on purchase price alone, without considering efficiency and running costs over its lifetime, often leads to a poor economic outcome, particularly when comparing a fossil-fuel boiler to a heat pump.
Neglecting periodic servicing or sweeping risks premature breakdowns, loss of warranty, and a safety and insurance risk. Delaying the replacement of an ageing boiler until it fails completely also removes time to compare offers and check eligibility for grants.
Under- or over-sizing the installation’s output, without a prior assessment of the property’s actual needs, leads to discomfort or excess consumption. Finally, accepting a vague quote without details on equipment and warranties makes any later complaint harder to resolve. Another common mistake is ignoring compatibility between the new system and existing radiators: installing a heat pump without checking whether the radiators in place can deliver enough heat at low flow temperature often results in poor comfort in winter, despite equipment that looks efficient on paper.
A solar thermal installation can be worthwhile in Luxembourg to cover part of the hot water demand independently of the main heat generator, particularly during the summer half of the year. The collectors are usually mounted on the roof and feed a combined hot water cylinder, topped up by the heating system as needed. During summer months, a well-sized installation can cover a significant share of a household's hot water needs, while its contribution naturally shrinks in winter.
Hybrid setups combining a heat pump with an existing gas boiler can make sense in some renovation cases, for instance when the existing radiators cannot be fully converted to low flow temperatures, or when extra output is needed on very cold days. The heat pump then covers most of the annual demand, while the gas boiler only kicks in on a handful of peak days. This can be a sensible interim solution when a full switch to a heat-pump-only system is not immediately possible for structural or financial reasons.
When planning a solar thermal or hybrid solution, it is worth discussing roof space, orientation and a possible later combination with a photovoltaic system with the professional early on, since both systems can compete for the same roof area.
Vert.lu is a lead-generation platform: you describe your heating project once, and the request is forwarded to heating companies in the network that match your criteria, location and type of work. You then receive their quotes directly and remain entirely free to choose which company to work with.
Vert.lu does not carry out any work itself and charges homeowners nothing for this matching service. The platform simply simplifies the often time-consuming first step of finding and comparing qualified companies.
After commissioning, it is worth monitoring the system for the first few weeks: room temperatures in different rooms, noise from the outdoor unit on a heat pump, and actual energy use compared with the previous period. Any deviation should be reported to the professional while the installation warranty and commissioning guarantee still apply.
For a heat pump, fine-tuning the heating curve during the first winter can noticeably improve comfort and reduce electricity use. This adjustment is usually carried out by the installer, sometimes remotely if the unit is connected. A flow temperature set too high reduces efficiency without meaningfully improving comfort.
For gas boilers, it is worth reviewing the heating curve after the first cold spell, particularly following radiator replacement or insulation work that has changed the building's heat demand. A boiler set too high wastes energy, while one set too low causes discomfort on cold days.