Solar PV 8 kWp
- Capacity
- 8 kWp
- Rate
- €1,400 then €1,200/kWp
- Residential cap
- €10,000
- Battery
- separate grant
Solar, heat pump, insulation: which grants apply, the conditions attached and the authorised companies that can carry out the work.
191 authorised energy and solar companies listed
Free estimate · No commitment
You are… ?
Company count from our directory; Klimabonus solar and heat pump amounts per guichet.public.lu. — Sources: guichet.public.lu
These calculation examples use the official Klimabonus rates. The final amount depends on the audited invoice and the administrative decision.
A grant is only paid when technical requirements are met and an authorised company carries out the work. That is where your request goes.
Order matters: the grant is claimed after the work, against the invoice.
Type of work, address and contact details. Two minutes are enough.
By an authorised company, with a detailed invoice and technical evidence.
With the competent administration, invoice and certificates attached.
The Klimabonus programme covers most energy renovation support: solar PV, heat pumps, batteries, insulation, ventilation and EV charging.
Residential solar PV is capped at €10,000 with tapering rates per capacity band. Heat pump caps depend on technology and situation, up to €12,000 for geothermal replacing fossil heating.
Exact amounts and conditions are published on guichet.public.lu, which we link directly.
Three recur: work carried out by an authorised company, minimum equipment performance, and filing within the deadline after invoicing.
Insulation requires a minimum thermal resistance; heat pumps are checked on performance coefficient and installation compliance.
A careful quote already states these values. If they are missing, ask before signing.
After the work, based on the paid invoice and technical certificates, plus proof of ownership or right of use.
Collect documents as you go: invoice, datasheets, before-and-after photos for insulation, electrical compliance certificate for solar.
Incomplete files are the main cause of delay.
Two minutes to size up your support and receive offers from authorised companies.