How do municipal grants work in Luxembourg?
Almost always as a percentage of the State aid. The commune does not re-examine your file: it waits for the ministry's decision on your Klimabonus grant, then pays a fraction of that amount, often with a cap per measure or per building. No State grant, no municipal grant.
Three models coexist:
- The flat percentage. Bertrange pays 25% of all State subsidies, Hesperange 35% with a cap of €8,500, Luxembourg City 50% on insulation, windows, solar and heat pumps.
- The percentage per measure. Esch-sur-Alzette, since March 2026, pays 10% of the State grant for solar and heat pumps, 20% for insulation and 50% for windows.
- The capped percentage per item. Differdange pays 50% of the State grant with a maximum of €5,000 per measure, €1,125 for a battery; Betzdorf 25% with a maximum of €2,500 for solar.
The rule shared by all: State and municipal aid combined can never exceed the real cost of the works. And every commune sets a filing deadline, often 6 or 12 months after the ministerial decision. After that, the money is gone.
Which commune pays how much for 6 kWp of solar or a heat pump?
Between €574 and €2,871 for solar, between €1,200 and €6,000 for a heat pump, depending on the commune. The table below applies the regulations in force in early November 2026 to two typical cases: a 6 kWp installation (Klimabonus grant €5,742) and an air-to-water heat pump replacing a fossil boiler in a house (Klimabonus grant €12,000 for an order placed between January 2026 and June 2027).
| Commune | Municipal rule | Solar 6 kWp | Air-to-water heat pump |
|---|---|---|---|
| Luxembourg City | 50% of the State aid | €2,871 | €6,000 |
| Differdange | 50%, max. €5,000 per measure | €2,871 | €5,000 |
| Hesperange | 35%, max. €8,500 | €2,010 | €4,200 |
| Walferdange | 30% PV (max. €3,000), 50% heat pump (max. €3,000) | €1,723 | €3,000 |
| Strassen | 30% PV, 25% heat pump | €1,723 | €3,000 |
| Bertrange | 25% of all State aid | €1,436 | €3,000 |
| Betzdorf (from 1 September 2026) | 25%, max. €2,500 | €1,436 | €2,500 |
| Esch-sur-Alzette | 10% PV and heat pump, 20% insulation, 50% windows | €574 | €1,200 |
Amounts calculated from the published municipal regulations; a commune can change its regulation at any time, so check the version in force before counting on it.
The gap is striking: for the same roof, a household in Luxembourg City receives five times more from its commune than a household in Esch. That should not decide where you move, but it belongs in your payback calculation. And the communes missing from this table are not necessarily less generous: many small rural communes, often through their climate pact, pay 20 to 50% of the State grant.
Which works do communes subsidise most often?
The same ones as the State, with a few local extras. If your measure qualifies for the Klimabonus, it almost always qualifies for the municipal top-up: roof, wall and slab insulation, windows, heat pump, solar, home battery, heat-recovery ventilation, energy advice.
Some communes go further than the State:
- Balcony systems. Differdange pays 50% of the price of a balcony solar kit under 0.8 kWp, €500 at most, whereas the State does not subsidise these small systems.
- The charging point. Walferdange adds €375 to €825 depending on the type of charger, plus €150 if it is coupled with solar; Luxembourg City and Strassen 50% of the State aid; Differdange €300 per household per ten-year period.
- Energy advice. Walferdange refunds 40% of the State aid, Differdange and Betzdorf 50% with a cap of €500 to €850. With the State grant of €2,000 for a house in 2026, the advice costs you almost nothing.
- Green roofs, rainwater tanks, efficient appliances. Luxembourg City pays €40 per m² of green roof, up to €8,000 per building.
Which conditions must you meet?
Having obtained the State aid, being a natural person and filing within the deadline. These are the three conditions found in almost every regulation.
The State decision first. The commune asks for a copy of the ministerial decision, sometimes proof of payment. It can therefore only act after the Klimabonus file has been processed, which often takes several months. Allow for that delay in your cash planning.
The dwelling on the commune's territory. Obvious, but beware of houses on the border of two communes: the building's address counts, not your current home address.
The deadlines. Six months after the State decision in Differdange, Strassen and Walferdange for most measures, one year in Hesperange. The regulation usually also states that a measure is subsidised only once per installation and per site.
The exclusions. Second-hand equipment, parts of a building used professionally, works not subsidised by the State. Differdange also requires the written consent of the co-owners' association for insulation in a condominium and compliance with the façade regulation for buildings over twenty years old.
Combining. Aid from the State, the commune and sometimes the energy supplier (enoprimes programme) can be combined, up to the real cost of the works. Betzdorf, for example, caps State plus commune at 70% of the investment, 85% for households receiving the cost-of-living allowance.
How do you file the application without forgetting anything?
Five steps, in this order:
- Read your commune's regulation before signing the quote. It is online on the municipal website, often under "subsidies" or "climate pact". Some communes require the State request for approval in principle to precede the order.
- File the Klimabonus application first on MyGuichet.lu, after the works, with the paid invoices and, for insulation, the material description.
- Wait for the ministerial decision, then photocopy it. It is the central document of the municipal file.
- Fill in the municipal form with the decision, the invoices, your bank details and, depending on the commune, proof of capacity in kWp, battery capacity or a photo of the installation.
- Respect the deadline: six or twelve months after the State decision depending on the commune. Note it in your diary as soon as the decision arrives.
A practical tip: ask your installer whether they know the regulations of the communes they work in. Our partner contractors often fill in the municipal forms with their customers, because they know a complete file is processed within a few weeks.
What if my commune is not in this guide?
It very probably has a regulation; you just need to find it. More than a hundred communes have signed the climate pact and the vast majority of them have adopted an energy subsidy regulation. Klima-Agence keeps track of municipal grants and gives you the details for your commune during a free consultation.
Three reflexes to check in ten minutes:
- Type the name of your commune followed by "subsides énergie" or "règlement subventions écologiques".
- Call the commune's technical department or climate adviser: informing you is their job, and they know the pitfalls of the form.
- Ask Klima-Agence during the energy consultation: the adviser tells you which State and municipal grants apply to your project.
Two realities to keep in mind. First, communes revise their regulations regularly, often to align them with the Klimabonus 2026 scheme: an amount read in a 2023 brochure may have changed. Second, municipal subsidies are not automatic: if you do not file the application, nobody will do it for you. On a €40,000 renovation project, the municipal grant easily represents €3,000 to €8,000. It is the best-paid form of the year.
Frequently asked questions
Do all communes in Luxembourg pay a renovation grant?
The vast majority, especially those that signed the climate pact. The amount ranges from 10% to 50% of the State aid depending on the commune, sometimes with a cap. Check the regulation in force on your commune's website or with Klima-Agence.
How much does my commune add for 6 kWp of solar?
With a Klimabonus grant of €5,742: about €2,871 in Luxembourg City or Differdange, €2,010 in Hesperange, €1,723 in Strassen or Walferdange, €1,436 in Bertrange or Betzdorf, €574 in Esch-sur-Alzette.
Can you get the municipal grant without the State grant?
No. Almost all regulations calculate the municipal grant as a percentage of the State decision and require a copy of it. No Klimabonus, no municipal top-up, except a few local measures such as balcony systems in Differdange.
What is the deadline for the municipal application?
Often six months after the ministerial decision, sometimes twelve. Hesperange allows one year. After the deadline the right is lost: note the date as soon as the State decision arrives.
Can municipal grants be combined with enoprimes and the 3% VAT?
Yes. State, commune, the energy supplier's enoprimes programme and the super-reduced VAT rate can be combined, up to the real cost of the works. Some communes cap State plus commune, for example at 70% of the investment in Betzdorf.
One price means little without a second
One request. Up to 7 quotes from Luxembourg tradespeople. You pay nothing, you sign nothing.
Request my quotesOfficial references