Three generations of the same tool: State aid for energy-efficient homes, managed by the Guichet unique des aides au logement, with free advice from Klima-Agence (formerly myenergy).
| Scheme | Period | What characterises it |
|---|---|---|
| PRIMe House | 2017 to 2021 (law of 23 December 2016) | Aid as a percentage of costs with caps, fossil insulation still funded, air-to-water heat pump not funded in existing homes |
| Klimabonus (RGD 2022) | Invoices 2022 to 2025, renovations until 2029 | Higher per m² amounts, air-to-water funded in existing homes, 25% bonus from November 2022, social top-up, end of fossil insulation on 1 January 2024 |
| Klimabonus Wunnen 2026-2030 | Agreement in principle 2026 to 2030, invoices until 2035 | Flat amounts for heating, insulation scale raised by 15 to 20% until 30 June 2027, prefinancing, HEMS, new green-roof measures |
The name PRIMe House disappeared from the forms in 2022, but many owners still use it, and so do many contractors' quotes. If a quote dated 2026 still mentions "PRIMe House", ask for an update: the technical conditions and amounts are no longer the same.
One thing the three schemes share: the aid is requested after the works, but the agreement in principle is requested before. It has been the most expensive mistake for ten years, and it has not changed.
What has changed for insulation and windows?
Per m² amounts have almost doubled between 2022 and 2026, and fossil insulation has left the scale. Under PRIMe House, the aid was calculated as a percentage of capped costs; since 2022, it is calculated per m² insulated according to the type of insulation and the performance reached, which has not changed in 2026.
| Measure (standard II) | Klimabonus 2022 | Klimabonus 2026 (enhanced) |
|---|---|---|
| Roof or wall, mineral insulation | €50 per m² | €80 per m² |
| Roof or wall, ecological insulation | €75 per m² | €120 per m² |
| Wall with cladding, ecological insulation | no line | €140 per m² |
| Cellar ceiling, mineral insulation | €25 per m² | €40 per m² |
| Windows and French doors | €55 per m² | €80 per m² |
| Heat-recovery ventilation | €45 per m² | €70 per m² |
| Fossil insulation (polystyrene) | funded until 31 December 2023 | no longer funded, except 50% recycled or against the ground |
2022 base amounts (the 25% bonus from November 2022 was added) and 2026 enhanced amounts for an agreement in principle requested before 30 June 2027.
For a 120 m² roof in mineral wool, the aid therefore goes from €6,000 (€7,500 with the 2022 bonus) to €9,600. For a 150 m² façade in wood fibre, from €11,250 to €18,000. The new 2026 lines (cladding, green roof and façade, €15 per m² top-up for recycled or certified insulation) did not exist before.
What has not moved: interior-only insulation is funded at 75% of the scale, windows require a Ug of 0.6 at most, and the window grant assumes an already decent wall or roof, or mechanical ventilation.
What has changed for heating?
The switch from percentage to flat amount, and clearly higher amounts when a fossil boiler disappears. It is the most visible change of 2026.
| Installation (existing single-family house) | PRIMe House 2017 | Klimabonus 2022 | Klimabonus 2026 (enhanced) |
|---|---|---|---|
| Air-to-water heat pump | not funded in existing homes | 50% of costs, max. €5,000 (+ 30% if replacement) | flat €12,000 with replacement, €8,000 without |
| Geothermal heat pump | capped percentage | 50% of costs, max. €8,000 (+ 30% if replacement) | flat €14,000 with replacement, €10,000 without |
| Pellet boiler | capped percentage | €750 per kW, max. €7,500 | flat €8,000 with replacement, €4,000 without |
| Log boiler | funded | €350 per kW, max. €3,500 | no longer funded as central heating |
| Solar thermal hot water | funded | €2,500 (+ €1,000 combined) | €2,500 (+ €1,000 combined), existing homes only |
| Oil tank | no line | Masuttersatz programme | €1,500 integrated into the Klimabonus, + €2,000 in a water protection zone |
Sources: guichet.lu (2022 and 2026 schemes), "Aides Klimabonus 2022" sheet of the Climate Pact.
The flat amount changes the logic of the quote. In 2022, an installer who inflated his price pushed the aid up to 50%; in 2026, the aid is fixed, every euro saved on the quote is yours. So compare prices without telling yourself "the State pays half anyway", it is no longer true.
Another change: the €2,000 for adapting the distribution system (radiators, underfloor heating) and the €2,000 top-up for an order placed before 30 June 2027 are 2026 novelties. New hybrid systems coupling a heat pump with a gas boiler, on the other hand, leave the scale.
And for photovoltaics and the battery?
Three different logics in ten years, and a 2026 grant that no longer depends on the price paid.
| PRIMe House 2017 | Klimabonus 2022 | Klimabonus 2026 | |
|---|---|---|---|
| Photovoltaics | 20% of costs, max. €500 per kWp, with feed-in tariff | 20% (€500 per kWp) with feed-in tariff, or 50% (€1,250 per kWp) without | formula P × (1,155 − 1,155/35 × P), i.e. €5,742 for 6 kWp, max. €10,000; self-consumption mandatory |
| Home battery | no line | no national line | Q × (500 − 500/18 × Q), i.e. €1,806 for 5 kWh, max. €2,250 |
| Prefinancing | no | no | yes: grant deducted from the invoice by an installer listed in the register |
| Energy management (HEMS) | no | no | €500 for invoices from 1 October 2026 |
For 6 kWp at €12,000, the 2022 aid without feed-in tariff reached €6,000 (50%), the 2026 aid gives €5,742. The gap is small, but the 2026 grant is known in advance, independent of the quote, and it arrives without a cash advance thanks to prefinancing. In return, choosing the guaranteed feed-in tariff excludes any grant, as in 2022.
The real novelty is the battery: until 2025, only a few municipalities funded it. Since 2026, the State pays up to €2,250, and a battery added later to an existing system remains eligible, provided 5 years pass between two funded batteries.
What has not changed?
The architecture of the system, and most of the rules that make you lose a grant. Here is what you can consider stable.
- The 10 years. Subsidised renovation concerns a building more than 10 years old since the building permit, in 2022 as in 2026.
- The agreement in principle before works. It remains the key to the file, with energy advice mandatory as soon as several elements are renovated.
- The energy class bonus. 20% for class C, 30% for B, 50% for A, if the renovation gains at least two classes: identical since 2022.
- The three insulation standards (III, II, I) and the fossil, mineral, ecological insulation categories, with the €15 top-up for recycled or certified.
- The 4-year deadline after 31 December of the invoice year to request payment.
- The social top-up, introduced in 2022, which increases the aid by up to 100% depending on household income.
- Municipal grants and 3% VAT on works to a dwelling over 10 years old, which still come on top.
My file started under the old scheme: what should I do?
Four cases, from the simplest to the trickiest:
- Klimabonus 2022 agreement in principle obtained before the end of 2025, works under way. You stay in that scheme: invoices accepted until 31 December 2029, payment request until 2031, with the 25% bonus. Nothing to redo.
- 2022 agreement in principle obtained, but works not started. Compare: for insulation, the enhanced 2026 scale is often more favourable than the 2022 scale plus 25%. Ask the Guichet unique des aides au logement whether you can file a new application under the 2026 scheme before the first hammer blow; start nothing before their written answer.
- Quote signed, no agreement in principle. File the 2026 agreement in principle request immediately on MyGuichet.lu, with the energy adviser's report. As long as the works have not started, you are in time.
- Heat pump or photovoltaics invoiced in 2025. They fall under the 2022 scheme; the application must go in within 4 years. A heat pump ordered before 30 June 2027, on the other hand, gets the enhanced 2026 flat amount.
In all cases, our partner contractors can take an "old scheme" quote and bring it up to 2026 standards: thickness, type of insulation, U-value and m² must appear in black and white.
Frequently asked questions
Does PRIMe House still exist in 2026?
No. PRIMe House covered the years 2017 to 2021. It was replaced by the Klimabonus in 2022, itself replaced by the Klimabonus Wunnen 2026-2030 since 1 January 2026.
Is the Klimabonus 2026 more generous than the Klimabonus 2022?
Yes on almost every line: insulation goes for example from €50 to €80 per m² for mineral insulation, the air-to-water heat pump from a maximum of €5,000 (plus 30%) to a flat €12,000 when replacing a fossil boiler.
I have an agreement in principle from 2024, do I have to reapply?
Not if the works are under way: you stay in the 2022 scheme with invoices until 2029. If the works have not started, ask the Guichet unique whether a new 2026 application is possible, as the scale is often more favourable.
Which grants disappeared with the Klimabonus 2026?
Standard fossil insulation, log and wood-chip boilers as central heating, solar thermal in new builds or a building under 10 years old, and new hybrid systems coupling a heat pump with a gas boiler.
What is completely new in 2026?
Flat amounts for heating, prefinancing by the installer, the battery grant, the €500 for an energy management system, green roofs and façades and the €2,000 top-up for a heat pump ordered before 30 June 2027.
One price means little without a second
One request. Up to 7 quotes from Luxembourg tradespeople. You pay nothing, you sign nothing.
Request my quotesOfficial references
guichet.lu, Klimabonus 2026 : rénovation énergétique d'un logement sur base d'un conseil en énergie · guichet.lu, Klimabonus 2026 : aide pour les installations techniques · guichet.lu, Klimabonus RGD 2022 : rénovation énergétique sur base d'un conseil en énergie (régime précédent) · Klima-Agence, « Klimabonus : ce qui change pour vos projets en 2026 » · Gouvernement du Luxembourg, communiqués du 22 décembre 2021 et du 16 juillet 2026 (gouvernement.lu, environnement.public.lu)